Smart Initiative

Smart Energy Meter

Advanced Metering Infrastructure (AMI) for Smart Energy

Operational Since 2014 Level 1 (Smart City Early Adopter) → Level 3 (Leading Smart City)
Lead Agency
Tenaga Nasional Berhad (TNB)

Key Metrics
meters installed 32000
outage reports auto sent 98

Image coming soon

In partnership with Tenaga Nasional Berhad (TNB), the Smart Energy Meter initiative accelerates Putrajaya’s transition toward a highly efficient, low-carbon municipal grid. By replacing legacy analog infrastructure with Advanced Metering Infrastructure (AMI), residents and city planners gain real-time visibility into electricity consumption patterns. This digital utility framework eliminates manual meter readings, empowers consumers to proactively manage their energy footprints, and provides the baseline data necessary for predictive grid balancing.

Zero Estimates: Billed only for exact usage without manual meter reading
Energy Budgeting: Set personalized threshold alerts (e.g. 75% or 100%)
Outage Notifications: Receive supply interruption updates directly via app
Energy Efficiency: Half-hourly consumption graphs to optimize power usage
Supports future integrations like Net Energy Metering (NEM) & Time-of-Use tariffs
Advanced Metering Infrastructure (AMI) myTNB Portal & App platform Radio Frequency (RF) Mesh Network

Initiative Details

Status Operational
Year Launched 2014
Domain
Rating Tier Level 1 (Smart City Early Adopter) → Level 3 (Leading Smart City)
Lead Agency
Tenaga Nasional Berhad (TNB)

Impact Metrics

meters installed 32000
outage reports auto sent 98

Strategic Alignment

Putrajaya Smart City Blueprint
Thrust 3: Smart Energy & Carbon Reduction
Malaysia Smart City Framework
Smart Environment (Energy Efficiency)
UN Sustainable Development Goals
SDG 7 SDG 9 SDG 11
All Initiatives